Facility capabilities
Built to handle the heaviest work in the Eastern Province
A purpose-built facility in Dammam with isolated, temperature-controlled areas for winding, testing and storage.
Dammam
Capacity that matches the Kingdom's heaviest plants
Published capabilities of the Dammam facility.
- Lifting capacity
- 20tons
- High-voltage AC testing
- 13.8kV AC
- DC testing & operation
- 1,000V DC
- Solo-run testing
- 4,000kW
- Motors repaired to date
- 50,000+
Overhead cranes for motors and equipment up to 20 tons
Test facilities designed for high-voltage AC equipment up to 13.8 kV
DC equipment testing and operation up to 1,000 V
Equipped to perform solo-run tests up to 4,000 kW
Across Saudi Arabia and the GCC since 1988
Facility equipment
The main machines and areas that make up the workshop.










- Temperature-controlled curing & burn-off oven
- VPI & dipping system
- Automatic coil winding machines
- Automatic rotor winding machines
- Slot-lining insulation creasing & forming machine
- Isolated & temperature-controlled winding area
- Isolated & temperature-controlled dark room & test lab
- 4 m × 2 m motor test bed
- High-capacity core-loss testing
- Dynamic balancing machine, 5 tons
- Mechanical department (lathe, milling, drilling)
- Degaussing / demagnetization coils
- Ultrasonic cleaning tank
- Isolated cleaning area
- Isolated painting booth
- Isolated & temperature-controlled storage area
- Cold stripping hub
- Portable high-capacity pullers
- Overhead cranes up to 20 tons
Facility gallery
A motor down, a shutdown to plan, or a component to make?
Send us the nameplate and a short description. We respond with a scope and a price, fast.